Home / Blog / Peak loads without hiring

Blog · Albania nearshoring

Peak loads without hiring: capacity that appears and disappears with the commission

BIM and GIS production per commission, between Italy and Albania
Capacity that appears with the commission and disappears with it.

The obligation arrived before the modellers: since 1 January 2025, Italian public works from 2 million euros up require BIM delivery — and the tender deadline will not wait for your next hire. If you have three commissions running at once and a team sized for one, nearshoring in Albania gives you capacity that appears with the commission and disappears with it, with no permanent addition to headcount.

Why the peak is an arithmetic problem, not a headcount problem

1. Your team is sized for the average load; the market sends you peaks

An in-house department sized for the average workload breaks down as soon as two or three commissions overlap: overtime, slipping drawings, postponed checks. Hiring for the peak means carrying the cost long after the peak is gone.

2. Nearshoring capacity scales with the load

Our team of 60-70 engineers, surveyors and modellers across Italy and Albania works as an extension of your practice: it starts with the commission and scales back down when the commission ends. You keep coordination, design decisions and the client relationship; we produce modelling, mapping and survey work against the workload plan we agree together.

3. Fixed costs become per-commission costs

An in-house department means salaries, workstations, licences and training twelve months a year, whether commissions need them or not. With outsourced production, the production cost sits inside the offer for each commission: you know what production costs before you sign, not after.

How it works in practice

4. One coordinator on each side

Every commission has a named contact on your side and one on ours, with a standing weekly slot during production. That is the rule that prevents the classic failure of outsourced work: diffused responsibility.

5. Same time zone, same working day

We work in the European time zone, on European delivery hours: questions get answered while your office is open, interim handovers land when your team starts the day. No overnight offshore cycle where every clarification costs you a day.

6. Delivery on your client's calendar

Survey processing runs while your team designs, the model advances while you negotiate the next phase with the client. When commissions overlap, you stop choosing which client to disappoint and start planning the calendar around opportunities.

7. It goes out under your name

Deliverables go out under your practice's name, on your template and under the employer's BEP: ISO 19650 processes, UNI 11337 references, INSPIRE specifications for geographic data where required. We stay behind, never in between: no branding of ours on the files.

Operational checklist: fix this in writing before you start

  • Written information requirements: what gets delivered, at which level of development or data specification, in which formats (one page is enough; verbal is not).
  • Employer's BEP and templates: we work on your BEP and your templates, never on an imposed template of ours.
  • Formats agreed upfront: native models plus open exchange formats (.rvt / .ifc from DWG/PDF drawings, point cloud to as-built model, federated .nwd model with clash report) so you always own usable data.
  • Shared environment and checking step: where files live and who checks what before anything reaches your client; every handover passes a documented quality check.
  • Two named coordinators and a standing weekly slot for the whole production run.
  • Workload plan and delivery calendar aligned with the tender or client deadlines.
  • Fixed price confirmed in writing before work starts, tied to the deliverable.

In short

Commission peaks are not solved by hiring for the peak and paying for the lull that follows. With a European team of 60-70 specialists that scales with workload, fixed costs become per-commission costs, communication stays inside the same working day, and deliveries hold your client's calendar — with deliverables under your name, over thirty years of production behind them, and European standards as routine. The condition is unglamorous: a few pages of written rules and one coordinator on each side. With that in place, the next commission beyond your capacity stops being a problem and starts being the plan.