Home / Blog / The €2 million BIM threshold

Blog · BIM · Public works

The €2 million BIM threshold, one year into force

Information model of a public work under coordination
Since 1 January 2025, digital information management is part of the contract — not an extra.

What Italy's BIM mandate has changed for public works — and what it means for contractors still delivering without a BIM department. The first full year of application is behind us: it is worth taking stock, without rhetoric, of what has actually changed in tenders and deliveries.

The rule, in short

Since 1 January 2025, digital information management is mandatory for public works of at least €2 million: Article 43 of Legislative Decree 36/2023 (the Public Procurement Code), as amended by Legislative Decree 209/2024. The threshold excludes maintenance; cultural heritage has its own threshold (€5.538 million). The technical framework is provided by UNI 11337 and UNI EN ISO 19650. In plain terms: above that threshold, the information model is not an optional working method — it is part of the contract.

What actually changed

Tender documents now speak information requirements

Above-threshold tenders routinely contain information requirements, expected levels of development (LOD) and delivery formats. The technical documentation — of the offer first, of execution later — is assessed on that basis too. Reading such a tender for the first time mid-bid is a losing position: these requirements are answered with organisation, not promises.

Information management enters at the offer, not at signature

Before 2025 a contractor could win first and decide "how" to produce the model later. Now the information-management setup is part of the bid: whoever cannot structure it must rely on someone who can — and demonstrate it already at tender stage.

The deliverable is no longer just drawings

For above-threshold works, the client receives — and is entitled to demand — deliverables consistent with the model: plans, elevations and quantities derived from the same information source. Handing over manually updated drawings plus a model frozen three months earlier is no longer a complete delivery.

Coordination runs through shared environments

Designer, contractor and client work on the same data in a common environment (the CDE): revisions, approvals and variations leave a trail. For the contractor this cuts both ways: the "official" documents live in the model, and misalignment between site files and the model becomes a contractual risk, not just a practical one.

Verifications and variations play out on the data

When a variation arrives, the question is no longer only "what does it cost" but "what does it do to the information model". Accounts, valuations and acceptance checks are measured against a digital reference. A contractor who cannot update the model is effectively outsourcing its own accounts to whoever can.

What it means for firms still delivering without a BIM department

The instinctive reaction — "let's hire two modellers" — is almost always wrong: profiles are scarce, the workload is not constant, and the real competence lies in coordination, not only in modelling. The realistic options are three.

1. An in-house department

The most solid and the slowest solution: recruiting, training, libraries and procedures built from zero. It makes sense for large contractors with a steady BIM workload; rarely for those entering now.

2. Last-minute subcontracting

The option the threshold made most expensive: modelling capacity is scarce, tender timelines are fixed, and price is set by whoever holds the capability. Quality risk stays with the contractor: a badly delivered model gets paid for in variations and re-checks.

3. A stable external production line, coordination in-house

The compromise that works: outsourced BIM production from a partner working to the contractor's own standard, while coordination and the client relationship stay in-house. You don't need a department to win the tender: you need a reliable chain. Where the work starts from existing conditions, the upstream piece is a scan-to-BIM survey delivering a model that is directly usable.

What waiting costs

Three things, in order of cost. Access: above-threshold tenders become dependent on third parties from the offer stage. Margin: BIM services bought in an emergency are paid at a premium. Reputation: a first difficult delivery to a public client weighs on the next ones. Whoever has already run a first pilot project — a small one, even with external production — has already paid the learning curve: that is the approach we describe step by step in our guide to starting small.

In short

One year of application has made one thing clear: the €2 million threshold did not introduce a box-ticking exercise — it moved the line of who can compete on public works alone. The real choice is not "BIM department, yes or no", but having control of information management — internal or external — when the tender asks for it.